Practical information to help builders prepare accurate timber frame, roof truss and structural package quote requests.
Quote checklist
Complete information helps New Stone quote faster and reduce back-and-forth before detailing and manufacturing.
Most quote delays come from missing revisions, unclear scope or incomplete engineering details. If the project is urgent, send the available documents first and clearly mark what is still pending.
For complex projects, include notes about site access, crane requirements, delivery sequencing and any prefabrication preferences.
Send documents to New Stone →Planning notes
Lead time depends on scope, drawing quality, engineering completeness, material availability and delivery scheduling.
Latest issue drawings reduce the risk of quoting or manufacturing from superseded information.
Structural details help confirm timber, truss, joist, lintel and steel requirements.
Early delivery planning helps coordinate site access, crews and installation windows.
Separating frames, trusses, joists, roof packs and steel requirements makes quoting more accurate.